Greiner Construction was hired by Ballard Spahr (formerly Lindquist and Vennum) to perform Pre-Construction and Construction services for their relocation within the IDS Center in Downtown Minneapolis. Ballard now occupies floors 18–21.
Scope of work
Multiple conference rooms with extensive acoustical features
Glass front offices surrounding the perimeter of the building