Nordic Ware Headquarters

New Addition and Renovation, Built On a Long-Term Partnership

About This Project

  • Location

    St. Louis Park

  • Size

    60,000+ sq ft

  • Year Completed

    2010

  • Architect

    Tushie Montgomery

  • Market Sector

    Industrial

Nordic Ware hired Greiner Construction to build a new warehouse with a shipping area, office and staff break rooms. Greiner had just over 100 days to complete the project for Nordic Ware to receive shipments at the new facility.

Upon site inspection, Greiner discovered that the land contained a mixture of organic soil with possible contaminants, requiring all soils to remain on-site.

Greiner made modifications to enhance the soil’s bearing capacity by crushing limestone boulders found in the excavation process and used it as fill for the base of the building.

Working diligently with the tight schedule and making necessary arrangements to overcome contaminated soil conditions, Greiner successfully completed the warehouse in time for Nordic Ware’s first shipment.

Greiner has continued to provide construction services throughout Nordic Ware’s work-space totaling over 30,000 square feet.

Departmental offices include:
– Human Resources
– Industrial Coating
– Quality Control
– Shipping
– Packaging
– Engineering
– Maintenance
– Metal Press

The project also included the renovation of three (3) separate break rooms and six (6) separate sets of restrooms that are located throughout the facility.