Close

Archer Daniels Midland

Build-Out for ADM Benson Quinn's New Office Space in the 121 S 8th St Tower

About This Project

  • Location

    Minneapolis

  • Size

    23,000 sq ft

  • Year Completed

    2017

  • Architect

    Studio Hive

  • Market Sector

    Workspace / Office

Greiner was hired by ADM to perform construction services for their office relocation into the 121 South 8th Street tower in downtown Minneapolis.
Providing Pre-Construction and Construction Services, Greiner remodeled the 23,000 square foot space to include executive offices, wellness room, board room, collaborative spaces, multiple huddle rooms and will showcase open offices around the perimeter.

The scope of work includes new mechanical, electrical and plumbing that was performed in a design/build manner, polished concrete floors, exposed wood veneer, vinyl wall coverings, pendant and track lighting, storefront offices, and a guest coffee bar with a Cambria countertop.

As one of the largest agriculture processors in the world, ADM’s Minneapolis location completed construction in 12 weeks.